| 1st fl bay walls moving |
|
1 |
| 999999999999999999999999999999 |
|
3 |
| Brace Roof Trusses |
|
1 |
| FIRE STOP WALL |
|
1 |
| Fracture below fist floor bath |
|
1 |
| Lintol above rear gate |
|
1 |
| Major repairs |
|
1 |
| Make good brickwork to gable w |
|
1 |
| Monitor only |
|
1 |
| No additional works required |
|
1 |
| Part rebuild stack |
|
1 |
| Portresv\dohrmneyskoh |
|
1 |
| REBUILD FRONT RHS RETAINING GA |
|
1 |
| Rebuild archway |
|
1 |
| Rebuild rhs basement void wall |
|
1 |
| Renew defective timber bresumm |
|
1 |
| RenewdeFectiie'bresummer |
|
1 |
| Repalce 1 row of brickwork |
|
1 |
| Rot in soleplate to timber fra |
|
1 |
| Supports for purlins removed. |
|
1 |
| UNEVEN FLOORS |
|
1 |
| access stairs |
|
1 |
| brickworks between bay windows |
|
1 |
| concrete repairs |
|
1 |
| condensationonrafters |
|
1 |
| dampness |
|
1 |
| demolish |
|
1 |
| fill cracks |
|
1 |
| fire wall in loft |
|
1 |
| flank render replace as largly |
|
1 |
| garage |
|
1 |
| glass roof panels |
|
1 |
| ixxrratoRoUsat,mrrinuunr.rr |
|
1 |
| leaning chimney stack |
|
1 |
| monitor front bressumer |
|
1 |
| new ash felt roof |
|
1 |
| one chimney leaning |
|
1 |
| outbuilding ? settlement |
|
1 |
| pt rebuild stacks |
|
1 |
| r |
|
1 |
| rake out joint |
|
1 |
| rebuild part outer skin cavity |
|
1 |
| rebuild platform for w tank |
|
1 |
| repair door flashing |
|
1 |
| repair masonry cavity |
|
1 |
| repair ridge |
|
1 |
| replace |
|
2 |
| replace lr window cill |
|
1 |
| replace ridge tiles |
|
1 |
| rising damp |
|
1 |
| roof timber (hip) split along |
|
1 |
| see notes back page |
|
1 |
| see notes below |
|
1 |
| severe damp penetration |
|
1 |
| sloping floors |
|
1 |
| stone chimney breast wall unst |
|
1 |
| strengthen/replace hip parlin |
|
1 |
| tiles falling from roof |
|
1 |
| tv ariel lying on roof |
|
1 |
| unstable chimney stack |
|
1 |