| 1 |
|
1 |
| Appears old movement. Moniter |
|
1 |
| Crack Stitching |
|
1 |
| Crack Stitching - Provide 2 No rows of Helibar or |
|
1 |
| Crack repairs |
|
1 |
| Crack repairs / pointing. |
|
1 |
| Crack repairs / repointing |
|
1 |
| Crack repairs. |
|
1 |
| FILL CRACK 5M |
|
1 |
| FILL CRACK X 1M |
|
1 |
| Fill 12 linear metres of cracks to renders |
|
1 |
| Fill 2m length of cracks with mortar |
|
1 |
| Fill Crack 1m |
|
1 |
| Fill ceiling crack 2m |
|
1 |
| Fill open joints with mortar |
|
1 |
| Fill with 3m linear of mortar |
|
1 |
| Helifix or similar tie bars in masonry joints |
|
1 |
| Install tell-tales to monitor movement only |
|
1 |
| Loft floor overloaded - remove stored items fromlo |
|
1 |
| Monitor & spec repair |
|
1 |
| Movement to front bay, monitor to diagnose cause a |
|
1 |
| Rebuilding/toothing in of b|wk |
|
1 |
| Remove 1 tree at rear and 6m of shrubs and hedge t |
|
1 |
| Repairs to cracks (sec 18) |
|
1 |
| Repairs to render |
|
1 |
| Repoint.crack 3m@backof house |
|
1 |
| SEE NOTES |
|
1 |
| Specialist crack repair |
|
1 |
| Staimless ties |
|
1 |
| Stitch brickwork - 1 m |
|
1 |
| Tie in brickwork 3m |
|
1 |
| Tie in top of flank wall |
|
1 |
| Till cracks gf and ff 16 linear metres. |
|
1 |
| Trees causing subsidence |
|
1 |
| Underpin extension |
|
1 |
| Vernier Monitor |
|
1 |
| assess in 6 months |
|
1 |
| crack repairs / re-pointing |
|
1 |
| evidence of movement in whole block but being inve |
|
1 |
| helifix or similar brick stitching |
|
1 |
| joint ties/mesh2m |
|
1 |
| monitor cracking between windows |
|
1 |
| monitor for progress |
|
1 |
| monitor small crack bricks |
|
1 |
| movement of wall abutting chimney flue |
|
1 |
| no action |
|
1 |
| repair horizontal crack to back wall |
|
1 |
| repairs to bay window. |
|
1 |
| review underpinning already done, may have been on |
|
1 |
| specialist. crack repair. |
|
1 |
| stitch brickwork 2 m long |
|
1 |
| underpin / re-build bay |
|
1 |
| works budget estimate £5000 + VAT |
|
1 |