*see notes at rear |
|
1 |
1leaning stack |
|
1 |
1st floor of bay unstable |
|
1 |
2 fractured stone cills |
|
1 |
2 gables insecure |
|
1 |
999999999999999999999999999999 |
|
16 |
Add bracing to both Pitches |
|
1 |
BEDROOM FLOOR (SOLID SLOPING) |
|
1 |
Bracing. |
|
1 |
CONCRETE REPAIRS |
|
1 |
Cracked Tiles |
|
1 |
Diagonal roof bracing |
|
1 |
Excavate 45m |
|
1 |
Large roof length - purlin in |
|
1 |
Metal roof covering |
|
1 |
Monitoring only |
|
1 |
NO ACTION REQUIRED |
|
1 |
Please see attached note. |
|
1 |
Please see notes. |
|
2 |
Provide v. mousment joint |
|
1 |
Rebuild front bay. |
|
1 |
Repair/replace |
|
1 |
Replace kite winders |
|
1 |
Replace tile cills. |
|
1 |
Repoint and Replace bricks |
|
1 |
SEE NOTES |
|
1 |
STEELWORK CORROSION REPAIRS |
|
1 |
STEPS IN GARDEN |
|
1 |
See notes. |
|
1 |
Spoiled door canopy. |
|
1 |
Stitch 1m lineas Fract brickwk |
|
1 |
Strenghthen frame |
|
1 |
additional bracing needed to |
|
1 |
bay to rear - mullion to bay. |
|
1 |
beam on 1st floor taken out an |
|
1 |
bracing required to roof truss |
|
1 |
bracing to bs5266 pt 3 |
|
1 |
car park level dropped with ho |
|
1 |
check floors |
|
1 |
chimney breast removed but |
|
1 |
chimney stack -see box |
|
1 |
chimney stack leaning |
|
1 |
chimney stack leaning on gable |
|
1 |
chimney stack removal |
|
1 |
collapse of outbuilding |
|
1 |
column in side wall caused hor |
|
1 |
converted cow sheds. |
|
1 |
crack repair |
|
1 |
cracked BKWK LHS wall centraly |
|
1 |
cracked brickwork |
|
1 |
cracked stone cills |
|
1 |
damage to sill |
|
1 |
damaged roof spar |
|
1 |
demolish conservatory |
|
1 |
don't know |
|
1 |
excavate trfal hole |
|
1 |
firewall unstable |
|
1 |
flat roof |
|
1 |
garage was rebuilt+chimney und |
|
1 |
insert beam |
|
1 |
internal cracking associated w |
|
1 |
investigate cracking to RH wal |
|
1 |
joist defection |
|
1 |
leaning chimney stack |
|
1 |
leaning stack |
|
1 |
make good |
|
2 |
mansard roof |
|
1 |
monitor |
|
1 |
n/a |
|
1 |
no fire breaks in roof space |
|
1 |
none |
|
2 |
on all terrace- rear extension |
|
1 |
part rebuild on progress |
|
1 |
provide 2 collars |
|
1 |
provide additional bracing to |
|
1 |
provide additional cross braci |
|
1 |
purlin failure due to wood kno |
|
1 |
r c lintels |
|
1 |
rear chimney leaning |
|
1 |
reattach strut to purlin |
|
1 |
rebuild |
|
2 |
rebuild 2 sections of outbuild |
|
1 |
rebuild chimeny stack |
|
1 |
rebuild chimney stack |
|
1 |
rebuild pier/wall to garage |
|
1 |
rebuild/repoint cracked brickw |
|
1 |
reconstruct platform for cold |
|
1 |
redecoration |
|
1 |
renew cills |
|
1 |
renew stone sub wall 1x repair |
|
1 |
repair concrete |
|
1 |
repair cracks |
|
1 |
repair drain |
|
1 |
replace |
|
2 |
replace bricks |
|
1 |
replace rotted garden stair |
|
1 |
repointing cracking associated |
|
1 |
requirement of additional brac |
|
1 |
roof no party walls |
|
1 |
see attached |
|
1 |
see attachment |
|
2 |
see note |
|
1 |
see notes |
|
1 |
sloping floor |
|
1 |
some loose disturbed brickwork |
|
1 |
some vertical cracking to |
|
1 |
spiling of brick arches |
|
1 |
steps to front entrance droppe |
|
1 |
subsidence |
|
1 |
thermal Mount |
|
1 |
underpinning. mine shaft in fr |
|
1 |