| *see notes at rear |
|
1 |
| 1leaning stack |
|
1 |
| 1st floor of bay unstable |
|
1 |
| 2 fractured stone cills |
|
1 |
| 2 gables insecure |
|
1 |
| 999999999999999999999999999999 |
|
16 |
| Add bracing to both Pitches |
|
1 |
| BEDROOM FLOOR (SOLID SLOPING) |
|
1 |
| Bracing. |
|
1 |
| CONCRETE REPAIRS |
|
1 |
| Cracked Tiles |
|
1 |
| Diagonal roof bracing |
|
1 |
| Excavate 45m |
|
1 |
| Large roof length - purlin in |
|
1 |
| Metal roof covering |
|
1 |
| Monitoring only |
|
1 |
| NO ACTION REQUIRED |
|
1 |
| Please see attached note. |
|
1 |
| Please see notes. |
|
2 |
| Provide v. mousment joint |
|
1 |
| Rebuild front bay. |
|
1 |
| Repair/replace |
|
1 |
| Replace kite winders |
|
1 |
| Replace tile cills. |
|
1 |
| Repoint and Replace bricks |
|
1 |
| SEE NOTES |
|
1 |
| STEELWORK CORROSION REPAIRS |
|
1 |
| STEPS IN GARDEN |
|
1 |
| See notes. |
|
1 |
| Spoiled door canopy. |
|
1 |
| Stitch 1m lineas Fract brickwk |
|
1 |
| Strenghthen frame |
|
1 |
| additional bracing needed to |
|
1 |
| bay to rear - mullion to bay. |
|
1 |
| beam on 1st floor taken out an |
|
1 |
| bracing required to roof truss |
|
1 |
| bracing to bs5266 pt 3 |
|
1 |
| car park level dropped with ho |
|
1 |
| check floors |
|
1 |
| chimney breast removed but |
|
1 |
| chimney stack -see box |
|
1 |
| chimney stack leaning |
|
1 |
| chimney stack leaning on gable |
|
1 |
| chimney stack removal |
|
1 |
| collapse of outbuilding |
|
1 |
| column in side wall caused hor |
|
1 |
| converted cow sheds. |
|
1 |
| crack repair |
|
1 |
| cracked BKWK LHS wall centraly |
|
1 |
| cracked brickwork |
|
1 |
| cracked stone cills |
|
1 |
| damage to sill |
|
1 |
| damaged roof spar |
|
1 |
| demolish conservatory |
|
1 |
| don't know |
|
1 |
| excavate trfal hole |
|
1 |
| firewall unstable |
|
1 |
| flat roof |
|
1 |
| garage was rebuilt+chimney und |
|
1 |
| insert beam |
|
1 |
| internal cracking associated w |
|
1 |
| investigate cracking to RH wal |
|
1 |
| joist defection |
|
1 |
| leaning chimney stack |
|
1 |
| leaning stack |
|
1 |
| make good |
|
2 |
| mansard roof |
|
1 |
| monitor |
|
1 |
| n/a |
|
1 |
| no fire breaks in roof space |
|
1 |
| none |
|
2 |
| on all terrace- rear extension |
|
1 |
| part rebuild on progress |
|
1 |
| provide 2 collars |
|
1 |
| provide additional bracing to |
|
1 |
| provide additional cross braci |
|
1 |
| purlin failure due to wood kno |
|
1 |
| r c lintels |
|
1 |
| rear chimney leaning |
|
1 |
| reattach strut to purlin |
|
1 |
| rebuild |
|
2 |
| rebuild 2 sections of outbuild |
|
1 |
| rebuild chimeny stack |
|
1 |
| rebuild chimney stack |
|
1 |
| rebuild pier/wall to garage |
|
1 |
| rebuild/repoint cracked brickw |
|
1 |
| reconstruct platform for cold |
|
1 |
| redecoration |
|
1 |
| renew cills |
|
1 |
| renew stone sub wall 1x repair |
|
1 |
| repair concrete |
|
1 |
| repair cracks |
|
1 |
| repair drain |
|
1 |
| replace |
|
2 |
| replace bricks |
|
1 |
| replace rotted garden stair |
|
1 |
| repointing cracking associated |
|
1 |
| requirement of additional brac |
|
1 |
| roof no party walls |
|
1 |
| see attached |
|
1 |
| see attachment |
|
2 |
| see note |
|
1 |
| see notes |
|
1 |
| sloping floor |
|
1 |
| some loose disturbed brickwork |
|
1 |
| some vertical cracking to |
|
1 |
| spiling of brick arches |
|
1 |
| steps to front entrance droppe |
|
1 |
| subsidence |
|
1 |
| thermal Mount |
|
1 |
| underpinning. mine shaft in fr |
|
1 |