0.5m2 hairline cracking to b/w |
|
1 |
1 SQUARE METRE |
|
1 |
1 purlin, 2 rafters |
|
1 |
10% roof structure vandalised |
|
1 |
10M |
|
1 |
12sm blockwork required |
|
1 |
1m crack on back wall adj to 5 |
|
1 |
1m row of 1/2 brick sill |
|
1 |
1m2 of party wall |
|
1 |
2 pieces separating frt slope |
|
1 |
2.0m length |
|
1 |
2.5m high |
|
1 |
2m |
|
1 |
2m2 |
|
1 |
2x |
|
1 |
3 at foot of stair between B&G |
|
1 |
3 new front lintels |
|
1 |
4 no |
|
1 |
50% missing |
|
1 |
5m2 |
|
1 |
6 or fewer bricks missing |
|
1 |
999999999999999999999999999999 |
|
31 |
@ 24 |
|
1 |
Additional bracing required to |
|
1 |
All broken. |
|
1 |
Bwk - Ext wc |
|
1 |
Concrete repairs. |
|
1 |
DPC bridged by pavement |
|
1 |
Demolish ad rebuild |
|
1 |
ENTRANCE AREA |
|
1 |
GABLE WALL PROUD CHAMBER LEVEL |
|
1 |
Has been existent min 19years |
|
1 |
Insert 4m beam |
|
1 |
Install faves vents |
|
1 |
Minor cracking on roof purlins |
|
1 |
OK |
|
1 |
Please see attached note. |
|
1 |
Replace |
|
1 |
Replace appprox 1m |
|
1 |
SEE NOTES |
|
1 |
Sloping floor - no repair req |
|
1 |
Strap across purlin |
|
1 |
T o rear elevation |
|
1 |
Whole roof -wind bracing. |
|
1 |
ajacent to window/door see box |
|
1 |
as above |
|
1 |
as previous x 1 |
|
1 |
concrete repairs |
|
1 |
crack draingae repairs |
|
1 |
crack repairs |
|
1 |
cracks in internal walls |
|
1 |
cut out and stitch in |
|
1 |
demolish conservatory |
|
1 |
demolish outbuilding |
|
1 |
driveway settlement |
|
1 |
erpinned-14 yrs ago-settlement |
|
1 |
external steel garden stair |
|
1 |
front of house underpin walls |
|
1 |
gangtrain trusses |
|
1 |
growth of trees |
|
1 |
in progress of being rebuilt |
|
1 |
insert 1 - 1.5m lintel |
|
1 |
insert herring bone strutting |
|
1 |
internally |
|
1 |
izontal cracks. repoint monito |
|
1 |
long crack in bedroom ceiling |
|
1 |
many bricks split-flank wall. |
|
1 |
movement between divider mat. |
|
1 |
n/a |
|
1 |
no foundation system mobile ho |
|
1 |
of Trussed Rafters (Diagonal) |
|
1 |
part chimney stack |
|
1 |
plasterboard joint sepeation. |
|
1 |
po solid floor prop |
|
1 |
pot rebuild specified elsewher |
|
1 |
re build |
|
1 |
rebuild |
|
1 |
rebuild 1st floor only, |
|
1 |
rebuild 8msq of brickwork |
|
1 |
rebuild as necessary |
|
1 |
rebuild brick mullions x 2 |
|
1 |
recover |
|
1 |
repair/ other |
|
1 |
replace floor to bathroom |
|
1 |
replace/strenghten member |
|
1 |
reset and resin fix tie rod |
|
1 |
roof ? not legible |
|
1 |
rotted wood canopy over front |
|
1 |
sacking felt |
|
1 |
see attachment |
|
1 |
see box |
|
1 |
see note |
|
1 |
slight cracking below balcony |
|
1 |
small hole in front wall brick |
|
1 |
steels put in. cracks bed wall |
|
1 |
strut 1 |
|
1 |
suggest should be replaced |
|
1 |
suspect area where previous dr |
|
1 |
treatment already specified |
|
1 |
tree at front of property |
|
1 |
under kitchen window and head |
|
1 |
vertical cracks.. |
|
1 |