Variablefstothst
LabelAny other problems - Specify treatment
Responses
(see below) 1
*see notes at rear 1
1leaning stack 1
1st floor of bay unstable 1
2 gables insecure 1
999999999999999999999999999999 17
BEDROOM FLOOR (SOLID SLOPING) 1
Bracing. 1
Cut out on roof timber 1
Diagonal roof bracing 1
Insert RSJ or UB 1
Large roof length - purlin in 1
Leaning chimney 1
Mundic 1
Please see attached note. 1
Please see notes. 3
Provide v. mousment joint 1
Rebuild brickwork to purlins. 1
Repair/replace 1
Replace kite winders 1
Replace metal stairs at rear 1
Replace tile cills. 1
Repoint porch /bay + some crac 1
SEE NOTES 1
Severely corroded metal fire e 1
Spoiled door canopy. 1
Stitch 1m lineas Fract brickwk 1
Strenghthen frame 1
additional bracing needed to 1
bay to rear - mullion to bay. 1
bracing required to roof truss 1
calcium silicate b/work cracki 1
car park level dropped with ho 1
chimney stack -see box 1
chimney stack leaning 1
chimney stack leaning on gable 1
chimney stack removal 1
chimneys interior & exterior 1
collapse of outbuilding 1
column in side wall caused hor 1
conc slab roof to bay def 1
converted cow sheds. 1
corner off entrance hall 1
corrosion to roof structure 1
cracked BKWK LHS wall centraly 1
cracked brickwork 1
cross brace 1
cross brace roof 1
cut in new cavity tray 1
damage to sill 1
damp 1
damp ? walls/roof 1
danipued 1
decay of exposed v/c beans to 1
demolish conservatory 1
fire damage to bulk of rear 1
firewall unstable 1
floors out of level 1
front bay-strapbackto main wll 1
garage roof 1
hairline crack tp flank wall 1
install lateral straps/ties 1
investigate cracking to RH wal 1
joist defection 1
lack of diagonal or lateral br 1
leaning chimney stack 1
leaning stack 2
make good 2
mansard roof 1
minor external cracks 1
n/a 1
no additional work required 1
no fire breaks in roof space 1
none 2
passage wall out of plum + dtd 1
perished b/w missing-not major 1
provide additional bracing to 1
provide additional cross braci 1
provide bracing to roof trusse 1
provide cross and diagonal bra 1
purlin cracked but has been pl 1
purlin failure due to wood kno 1
reattach strut to purlin 1
rebuild 3
rebuild 2 sections of outbuild 1
rebuild chimeny stack 1
rebuild chimney 1
rebuild chimney stack 1
rebuild pier/wall to garage 1
rebuild/repoint cracked brickw 1
reconstruct platform for cold 1
remove internat chimnies 1
renew floor 1
renew lintel&brickwork to gara 1
renwe bulkhead 1
repair cracks 1
repair drain 1
repair external fire escape 1
repair/relay drain 1
replac beam 1
replace 2
replace bricks 1
replace rotted garden stair 1
requirement of additional brac 1
roof no party walls 1
see attached 1
see attachment 2
see box 1
see note 4
see notes 1
slight slope on ground floors 1
sloping floor 1
some loose disturbed brickwork 1
stack 1
strengthen timber bean 1
structual support (steel) 1
thermal Mount 1
tie in dormer 1
tree bush 1
wall plate rotten at end 1