(see below) |
|
1 |
1m2 |
|
1 |
999999999999999999999999999999 |
|
11 |
Condensation problem-see secti |
|
1 |
Cracked base RHS wall 1m lengt |
|
1 |
Cut out on roof timber |
|
1 |
Demolish outbuilding |
|
1 |
Fracture plus spread of wing |
|
1 |
Gallows brackets |
|
1 |
Insert RSJ or UB |
|
1 |
Leaning chimney |
|
1 |
Mundic |
|
1 |
Please see notes. |
|
1 |
Rebuild |
|
2 |
Rebuild brickwork to purlins. |
|
1 |
Rebuild chimney stack |
|
1 |
Rebuild leaning stacks. |
|
1 |
Recast step & rebuild side wal |
|
1 |
Replace front step |
|
1 |
Replace metal stairs at rear |
|
1 |
Repoint porch /bay + some crac |
|
1 |
Severely corroded metal fire e |
|
1 |
Vertical crack to chimney |
|
1 |
an external window will not |
|
1 |
calcium silicate b/work cracki |
|
1 |
chimney stack requires partial |
|
1 |
chimneys interior & exterior |
|
1 |
conc slab roof to bay def |
|
1 |
concrete canopy repairs |
|
1 |
concrete cill |
|
1 |
concrete mullion |
|
1 |
corner off entrance hall |
|
1 |
corrosion to roof structure |
|
1 |
cross brace |
|
1 |
cross brace roof |
|
1 |
cut in new cavity tray |
|
1 |
damp |
|
1 |
damp ? walls/roof |
|
1 |
danipued |
|
1 |
decay of exposed v/c beans to |
|
1 |
dormer reduced |
|
1 |
fire damage to bulk of rear |
|
1 |
floors out of level |
|
1 |
front bay-strapbackto main wll |
|
1 |
garage roof |
|
1 |
hairline crack tp flank wall |
|
1 |
install lateral straps/ties |
|
1 |
lack of ? to gangrail ? |
|
1 |
lack of diagonal or lateral br |
|
1 |
leaning stack |
|
1 |
make good cracks |
|
1 |
making good to 40m2 concrete |
|
1 |
minor cracks |
|
1 |
minor external cracks |
|
1 |
n/a part rebuild of chimney |
|
1 |
no additional work required |
|
1 |
no mechanical ventilation to g |
|
1 |
no support- chimney stack |
|
1 |
none |
|
1 |
nvestigate cold bridging |
|
1 |
passage wall out of plum + dtd |
|
1 |
patchy spalling concrete to |
|
1 |
perished b/w missing-not major |
|
1 |
provide bracing to roof trusse |
|
1 |
provide cross and diagonal bra |
|
1 |
prune large horsechestnut tree |
|
1 |
pt rebuild chimney |
|
1 |
purlin cracked but has been pl |
|
1 |
rebuild |
|
3 |
rebuild chimney |
|
3 |
relay steps rebuild wall |
|
1 |
remove internat chimnies |
|
1 |
remove llelladei |
|
1 |
remove vegetation ?? |
|
1 |
renew floor |
|
1 |
renew lintel&brickwork to gara |
|
1 |
renwe bulkhead |
|
1 |
repair brk wk-minor no bulging |
|
1 |
repair external fire escape |
|
1 |
repair/install tanking |
|
1 |
repair/relay drain |
|
1 |
replac beam |
|
1 |
roof straps |
|
1 |
seal |
|
1 |
section of lh wall to front ad |
|
1 |
see box |
|
1 |
see note |
|
3 |
slab settlement |
|
1 |
slight slope on ground floors |
|
1 |
small hairline crack front lhs |
|
1 |
stack |
|
1 |
strengthen timber bean |
|
1 |
structual support (steel) |
|
1 |
support to stock |
|
1 |
take down & rebuild part of |
|
1 |
tie in dormer |
|
1 |
tree bush |
|
1 |
vandalised and perished brickw |
|
1 |
vertical cracking at corners.. |
|
1 |
wall plate rotten at end |
|
1 |