1 dormer |
|
1 |
1 no. to rear |
|
1 |
1 x 2.5 timber beam |
|
1 |
1 x 2m |
|
1 |
15 m of 150mm dia drain pipe |
|
1 |
16 no. |
|
1 |
16 square metres |
|
1 |
1m |
|
1 |
1m2 |
|
1 |
2 |
|
1 |
2 stacks |
|
1 |
2.5 m |
|
1 |
205m retain wall6steps3m wide |
|
1 |
2m squared |
|
1 |
2m3 |
|
1 |
3 meters |
|
1 |
3 window reveals |
|
1 |
3m |
|
1 |
3m2 area sigle storey |
|
1 |
3m3 |
|
1 |
4 cracked cills |
|
1 |
5m2 |
|
1 |
5m2 ny basement stairs |
|
1 |
6m |
|
1 |
999999999999999999999999999999 |
|
26 |
< 1m2 (50x200mm2) |
|
1 |
? |
|
1 |
Approx. 1m2 |
|
1 |
Assess stability |
|
1 |
Bay window wall. |
|
1 |
Entrie unit |
|
1 |
From bedroom to porch |
|
1 |
Inspection, repairs & replacem |
|
1 |
Install 50additional wall ties |
|
1 |
Leaning chimney stack |
|
1 |
No Info given |
|
1 |
Part rebuild |
|
1 |
Remove tree. |
|
1 |
add furring pieces to joists |
|
1 |
all doors windows replaced & |
|
1 |
balcony |
|
1 |
bracing to trusses in roof str |
|
1 |
chimney 2m3 |
|
1 |
chimney leaning,cracked and |
|
1 |
clean down and repaint |
|
1 |
cont. chimney |
|
1 |
damp penetiation |
|
1 |
diagonal bracing to whole roof |
|
1 |
disused stock has no support |
|
1 |
exposed reinf at corner |
|
1 |
extensive cracking no movement |
|
1 |
ground floor heave |
|
1 |
h ground floor |
|
1 |
minor cracking to rear wall |
|
1 |
minor rising damp |
|
1 |
monitor |
|
1 |
no |
|
1 |
porch coming away from buildin |
|
1 |
re-enforce |
|
1 |
rebuild |
|
1 |
rebuild 0.25m2 brickwork |
|
1 |
rebuild 2 stacks in roof space |
|
1 |
rebuild as above |
|
1 |
rebuild locally 2 sq m |
|
1 |
rebuiled |
|
1 |
recontigure unit |
|
1 |
rectify and rebuild tank plat |
|
1 |
remove tree front right |
|
1 |
replace |
|
1 |
replace corroded teals ladys |
|
1 |
replace structure |
|
1 |
rtenew joists and boards to |
|
1 |
see above |
|
1 |
see above note and rear page |
|
1 |
see attached |
|
1 |
see note |
|
3 |
see notel |
|
1 |
see notes on back page |
|
1 |
see section 6 |
|
1 |
see surveyor notes |
|
1 |
sever spalling a DPC |
|
1 |
spalling concrete cills to |
|
1 |
stairs slope sideways |
|
1 |
steps very bad condition |
|
1 |
subject to furthr examination |
|
1 |
under window drill hole for |
|
1 |
under windows cracks |
|
1 |
wall and roof to kitchen |
|
1 |
whole roof |
|
1 |
x3 make good |
|
1 |