| 1 no. to rear |
|
1 |
| 1 x 2m |
|
1 |
| 16 no. |
|
1 |
| 1m |
|
2 |
| 1m2 |
|
1 |
| 1m2 of brck needs "tidyg"/stab |
|
1 |
| 1st floor deflection |
|
1 |
| 1xsteel post |
|
1 |
| 2 |
|
1 |
| 2 stacks |
|
1 |
| 205m retain wall6steps3m wide |
|
1 |
| 2m |
|
1 |
| 2m squared |
|
1 |
| 3 window reveals |
|
1 |
| 3m2 area sigle storey |
|
1 |
| 3m3 |
|
1 |
| 4 No Purlin Ends. |
|
1 |
| 4 cracked cills |
|
1 |
| 5m2 |
|
2 |
| 5m2 ny basement stairs |
|
1 |
| 8m2 of living room slab floor |
|
1 |
| 999999999999999999999999999999 |
|
27 |
| < 1m2 (50x200mm2) |
|
1 |
| Areas-clean steel & repoint. |
|
1 |
| Bay window wall. |
|
1 |
| Cut out spalled bricks |
|
1 |
| Install 50additional wall ties |
|
1 |
| Leaning chimney stack |
|
1 |
| No Info given |
|
1 |
| Part rebuild |
|
1 |
| Replace ground floor flooring. |
|
1 |
| Weight from over hanging gable |
|
1 |
| additions moving away from mai |
|
1 |
| all doors windows replaced & |
|
1 |
| all floor |
|
1 |
| all needs rebuilding |
|
1 |
| as covered on S18 |
|
1 |
| as covered on s18 |
|
1 |
| bay parapets |
|
1 |
| bedrooma and bathroom |
|
1 |
| being demolished |
|
1 |
| chimney 2m3 |
|
1 |
| chimney stack |
|
1 |
| cont. chimney |
|
1 |
| crack above window |
|
1 |
| cracks around opening where 2 |
|
1 |
| cracks in front wall to be |
|
1 |
| disused stock has no support |
|
1 |
| fan 1 x chimney stack |
|
1 |
| garage wall cracking |
|
1 |
| longstanding floor slope |
|
1 |
| major crack at base,moving |
|
1 |
| making good to concrete 4sqm |
|
1 |
| minor cracking to rear wall |
|
1 |
| mob home near end of life. |
|
1 |
| monitor |
|
1 |
| no action requierd |
|
1 |
| none |
|
1 |
| number 1 |
|
1 |
| one - stack work |
|
1 |
| porch coming away from buildin |
|
1 |
| rebuild stack 2.5m high |
|
1 |
| rebuiled |
|
1 |
| rectify and rebuild tank plat |
|
1 |
| replace |
|
1 |
| replace (equivalent to 1 no ) |
|
1 |
| repoint rear elevation |
|
1 |
| rooftop to rod structra & tank |
|
1 |
| rotten roof fascia/tile/soffit |
|
1 |
| see attached |
|
1 |
| see section 6 |
|
1 |
| sever spalling a DPC |
|
1 |
| slight movement of roof load |
|
1 |
| specified in section 18 |
|
1 |
| support remaining stack |
|
1 |
| under window drill hole for |
|
1 |
| vertical. underpin and rebuild |
|
1 |